STANDAR PERUSAHAAN UMUM LISTRIK NEGARA
SPLN 99: 1992
Lampiran Surat Keputusan Direksi PLN No.036/DIR/80, Tanggal 21 Mei 1980
Warna Lambang Standar Untuk Diagram Mimik
DEPARTEMEN PERTAMBANGAN DAN ENERGI
PERUSAHAAN UMUM LISTRIK NEGARA
JL TRUNOJOYO MI/135 – KEBAYORAN BARU – JAKARTA
Susunan Anggota Kelompok Pembakuan Bidang Transmisi
Berdasarkan Surat Keputusan Direksi Perusahaan Umum Listrik Negara
No.077/DIR/88 Tanggal 21 September 1988

Susunan Anggota Kelompok Kerja Mimik Bus
Berdasarkan Surat Keputusan Direktur Pusat Penyelidikan Masalah Kelistrikan
No.20.K/494/PPMK/1990 Tanggal 9 Mei 1990

DAFTAR ISI
Pasal Satu: Ruang Lingkup dan Tujuan
1. Ruang Lingkup
2. Tujuan
Pasal Dua: Definisi
3. Diagram Mimik
Pasal Tiga: Warna Lambang Standar untuk Diagram Mimik
4. Ketentuan Umum
5. Diagram Mimik dengan Satu Tingkat Tegangan Nominal
6. Contoh Penerapan Warna Lambang Standar
Alternatif artikel yang menarik lainnya:
- Sambungan Tenaga Listrik Tegangan Menengah Diatas 8 MNA s/d 60 MVA Bagian 1: Saluran Kabel Dibawah Tanah – SPLN 56-3-1: 1996 – Bagian 7
6.8. Catu daya Harus disediakan transformator pemakaian sendiri, pengisi baterai, baterai 48 Vas minimal dengan kapasitas 50 Ah dan juga RTU dalam hal ini dilengkapi dengan sistem SCADA. 6.9. Peralatan utama selain kabel tanah Peralatan utama selain kabel tanah antara lain trafo arus, trafo tegangan, PMT, PMS, kubikel, rele, baterai, pengisi baterai dan kabel kontrol harus mengikuti ketentuan SPLN yang - Application Guide for On-Load Tap-Changers Pedoman Penerapan Pengubah Sadapan Berbeban – SPLN 18B: 1979 – Bagian 2
INTERNATIONAL ELECTROTECHNICAL COMMISSIONAPPLICATION GUIDE FOR ON-LOAD TAP-CHANGERS FOREWORD The formal decisions or agreements of the IEC on technical matters, prepared by Technical Committees on which all the National Committees having a special interest therein are represented, express, as nearly as possible, an international consensus of opinion on the subjects dealt with. They have the form of recommendations for - Feasibility Study for the Improvement of the Electric Distribution System in 3 cities and Establishment of a DAS Pilot Project in Semarang, Indonesia – Final Report (Summary) – Contents
Contents Preface I. Project General 1. Project Outline 1-1 Project Title 1-2 Project Objectives 1-3 Project Procedures 1-4 Project Outline 1-5 Expected Effect 2. Project Schedule and Implementation Method 2-1 Premise of the Study 2-2 Implementation and Flow of the Project 2-2-1 Project implementation 2-2-2 Procedures of the project 2-2-3 Project work plan & performance 2-3 KEPCO Project Team Organization and Staffing Schedule 2-3-1 Organization 2-3-2 Staffing schedule 2-4 Report Submit and Seminar 2-4-1 - Masukkan Judul dari Artikel Anda
Tuliskan artikel anda di sini. INI ADALAH TEST UPLOAD ARTIKEL OLEH SEORANG CONTRIBUTOR - Konektor Tembus Kedap Air Untuk Kabel Pilin Udara Tegangan Rendah – SPLN 84: 1992 – Bagian 9
25. Cara Uji 25.1. Cara Uji Bahan Gemuk 25.1.1. Uji Daur Panas Uji daur panas pada gemuk (grease) dilakukan terhadap sejumlah gemuk dengan berat tertentu. Uji daur panas sebanyak 3 daur, yang masing-masing daur suhunya terdiri dari 110 °C selama 24 jam kemudian dibiarkan berhubungan dengan udara luar selama 48 jam. Selanjutnya gemuk ditimbang dan dibandingkan dengan berat mula-mula untuk menentukan


Berikan tanggapan
Anda harus logged in untuk memberikan tanggapan.