RSNI-1: 2004
RANCANGAN STANDAR NASIONAL
SPLN 47-1: 1981
Pembakuan PLTD
Bagian 1: PLTD Bakal, PLTD Kecil dan PLTD Sedang
DEPARTEMEN ENERGI DAN SUMBER DAYA MINERAL
DIREKTORAT JENDERAL LISTRIK DAN PEMANFAATAN ENERGI
JAKARTA – 2004
DAFTAR ISI
6. PLTD Bakal
6.1. Lahan PLTD
6.2. Bangunan PLTD
6.3. Spesifikasi Satuan Pembangkit Diesel Bakal
6.4. Perlengkapan Listrik
6.5. Perlengkapan Umum
7. PLTD Kecil
7.1. Lahan PLTD
7.2. Bangunan PLTD
7.3. Satuan Pembangkit Diesel
7.4. Perlengkapan Listrik
7.5. Peralatan Bantu SPD PLTD Kecil
7.5.4. Sirkit pendingin silinder
7.5.5. Sirkit pendingin udara-masuk
7.5.6. Sirkit bahan bakar
7.5.7. Sirkit pelumasan
7.5.8. Sirkit udara-tekan
7.6. Perlengkapan Umum
8. PLTD Sedang
8.1. Lahan PLTD
8.2. Bangunan PLTD
8.3. Satuan Pembangkit Diesel
8.4. Perlengkapan Listrik
8.5. Perlengkapan Umum
(ayat 9 dan sub-ayat 9.1. bahannya tidak ada?)
Gambar 1: Bagan sirkit peralatan bantu PLTD Kecil I – SPD 250kW, 500kW, 750kW, 1.000kW
Gambar 2: Bagan sirkit peralatan bantu PLTD Sedang – SPD 2.500kW, 4.000kW, 8.000kW
Alternatif artikel yang menarik lainnya:
- Pembumian Netral Sistem 20 kV Dengan Lebih Dari Satu Sumber – SPLN 88: 1991 – Bagian 7
LAMPIRAN 1CONTOH KASUS-KASUS SISTEM 20 KV DENGAN LEBIH DARISATU SUMBER YANG ADA DI PLN WILAYAH Kasus-kasus dari masalah ini telah banyak terdapat di beberapa wilayah PLN misalnya: 1. Sistem Samarinda (PLN Wilayah VI) PLTD lama (6×4 MW) dengan pembumian langsung pada sisi 20 kV diinterkoneksikan dengan suatu PLTD Baru dari proyek Akselerasi (2~t5 MW ???) dengan pembumian melalui resistans - Power Quality Initiatives (SESCo) – Bagian 5
Materi dari 17th AESIEAP Technical Committee and Subcommittees Meeting (Kuching, Sarawak, Malaysia, 10th-14th August 2004) Slide 10 Slide 11 Slide sebelumnya Kembali ke daftar isi artikel ini Download dokumen dari artikel ini - Feasibility Study for the Improvement of the Electric Distribution System in 3 cities and Establishment of a DAS Pilot Project in Semarang, Indonesia – Final Report (Summary) – Part III – Improvement of Fault Prevention
III Improvement of Reliability 3. Improvement of Fault Prevention 3-1 Prevention of Tree Contact 3-1-1 Tree Trimming Unless all cable is completely insulated or installed underground, their is no technical alternative to prevent trees from contacting electrical facilities other than securing sufficient clearance between trees and electrical facilities. Against the backdrop, PLN has been trimming trees steadily by using - Pedoman Penerapan Metode ASTM Untuk Analisa Batubara – SPLN 048: 1981 – (RSNI-1: 2004) – Bagian 7
4.18. ASTM D3177 ??” 75 Standard Test Method for Total Sulfur In The Analysis Sample of Coal And Coke Metode Uji Baku untuk belerang total dalam sampel Batubara dan Kokas Metode ini mencakup tiga alternative cara untuk menentukan belerang dalam batubara dan kokas. Belerang dalam batubara akan menimbulkan korosi dan pencemaran lingkungan Suhu cerobong diatur sesuai dengan kandungan belerang - Pola Pengamanan Sistem Bagian 3: Sistem Distribusi 6 kV Dan 20 kV – SPLN 52-3: 1983 – Bagian 30
Lampiran DJARINGAN SPINDEL Gambar 1a Gambar 1b Kembali ke daftar isi artikel ini Download dokumen PDF dari artikel ini


Berikan tanggapan
Anda harus logged in untuk memberikan tanggapan.